Every permit the city issued in Chicago that week, straight from the public record — what got built, what it's worth, and who pulled the paperwork.
| Address | What | Declared | Who pulled it | Phone |
|---|---|---|---|---|
| 931 N HALSTED ST | DDS 2019 CBC: FULL BUILDING PERMIT FOR FLOORS LOWER LEVEL 2 THROUGH ROOF, INCLUDING 6TH FLOOR EXTERIOR AMENTIT | $190.0M | SHAMROCK ELECTRIC CO.INC | 🔒 |
| 1400 W 44TH ST | DDS 2019 CBRC: TENANT BUILD OUT IN AN EXISTING WAREHOUSE FOR EXPANSION OF A FOOD PROCESSING FACILITY AS PER PL | $39.5M | PREFERRED ELECTRICAL CONSTRUCT | 🔒 |
| 2731 N LEAVITT ST | DDS 2019 CBRC: BUILDING S-01, 2731 - 2759 N LEAVITT ST AND 2041 - 2049 W DIVERSEY PARKWAY. ALTERATIONS TO EXIS | $25.0M | ELITE ELECTRIC CO. INC. | 🔒 |
| 1330 W 76TH ST | DDS 2019 CBC INTERIOR RENOVATION TO EXISTING 3 STORY 164 UNIT BUILDING; CONVERSION OF COMMON AREAS PER 2010 AD | $23.2M | CINCO ELECTRIC, INC. | 🔒 |
| 705 W CHICAGO AVE | INSTALLATION OF (1) ESCALATOR PURSUANT TO PLANS SUBMITTED AND SUBJECT TO CITY OF CHICAGO DEPT. OF BUILDINGS EL | $21.9M | OTIS ELEVATOR - LOMBARD | 🔒 |
| 705 W CHICAGO AVE | INSTALLATION OF (6) SIX EG PASSENGER ELEVATORS; CARS P3-P8: 4000LBS CAPACITY @ 350FPM, 7 FLOORS, PURSUANT TO P | $21.9M | OTIS ELEVATOR - LOMBARD | 🔒 |
| 705 W CHICAGO AVE | INSTALLATION OF (2) TWO EG PASSENGER ELEVATORS: CAR P11; 3500LBS @ 200FPM, 3 STOPS AND CAR S1; 5000LBS CAPACIT | $21.9M | OTIS ELEVATOR - LOMBARD | 🔒 |
| 2750 N HOYNE AVE | DDS 2019 CBRC: BUILDING S-02, 2750 - 2768 N HOYNE AVE AND 2029-2035 W DIVERSEY PARKWAY. ALTERATIONS TO EXISTIN | $18.0M | ELITE ELECTRIC CO. INC. | 🔒 |
| 10000 W OHARE ST | SPR 2019 CRBC: INTERIOR ALTERATIONS TO EIGHT (8) RESTROOMS THROUGHOUT THE O'HARE INTERNATIONAL AIRPORT CAMPUS | $17.5M | HARTMANN ELECTRIC COMPANY, INC | 🔒 |
| 720 W GORDON TER | SPR / 2019 CBRC: REPLACEMENT OF EXISTING PLUMING RISERS AND DISTRIBUTION LINES IN AN EXISTING 22-STORY RESIDEN | $14.2M | G3 CONSTRUCTION GROUP, INC. | 🔒 |
| Address | What | Declared | Who pulled it | Phone |
|---|---|---|---|---|
| 2951 S CANAL ST | NEW DETACHED WOOD FRAME GARAGE. DIMENSIONS AND SETBACKS PER APPLICATION. BUILDING OUTSIDE DIMENSIONS: 24'-0' ' Fresh roof — prime solar-ready signal |
$29k | LEADER GARAGE BUILDERS INC | 🔒 |
| 911 W DIVERSEY PKWY | COMPLEX DEMOLITION: WRECK AND REMOVE A 2 STORY MASONRY RESIDENCE AND A DETACHED FRAME GARAGE Demolition — debris hauling needed within days |
$25k | BUILDER LUXURY INC | 🔒 |
| 10100 S LOWE AVE | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: STEEP (>5:12). INVERTER OUTPUT: 10 KW. ARRAY OU Fresh roof — prime solar-ready signal |
$20k | SUNRUN INSTALLATION SERVICES | 🔒 |
| 601 S LA SALLE ST | DDS 2019 CBRC: NON-STRUCTURAL INTERIOR DEMOLITION WITHIN AN EXISTING SEVEN-STORY HEAVY TIMBER TYPE IV BUILDING Demolition — debris hauling needed within days |
$150k | MIREX ELECTRIC & CONSTRUCTION, | 🔒 |
| 1039 W 104TH PL | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 10 KW. Fresh roof — prime solar-ready signal |
$15k | SUNRUN INSTALLATION SERVICES | 🔒 |
| 9516 S LOOMIS ST | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: SLOPED (2:12 TO 5:12). INVERTER OUTPUT: 11.5 KW Fresh roof — prime solar-ready signal |
$36k | SUNRUN INSTALLATION SERVICES | 🔒 |
| 3712 N KEDVALE AVE | INSTALL SOLAR PANELS ON ROOF OF PRINCIPAL BUILDING. ROOF TYPE: STEEP (>5:12). INVERTER OUTPUT: 7.2 KW. ARRAY O Fresh roof — prime solar-ready signal |
$23k | WINDFREE WIND + SOLAR ENERGY DESIGN COMPANY | 🔒 |
| 3348 N ALBANY AVE | SC 2019 CBRC: ERECT A NEW 2-STORY WITH BASEMENT FRAME SINGLE-FAMILY RESIDENCE, NEW ELECTRICAL, HVAC, AND PLUMB New construction — foundation/flatwork pour coming |
$450k | PIOTRA SURTEL | 🔒 |
| Contractor | Permits | Declared value | Phone |
|---|---|---|---|
| SUNRUN INSTALLATION SERVICES | 35 | $750k | 🔒 |
| FREEMAN ELECTRICAL, INC. | 17 | $17k | 🔒 |
| SUNRUN INSTALLATION SERVICES INC | 11 | $35k | 🔒 |
| CERTIFIED ELECTRIC LLC | 10 | $242k | 🔒 |
| ELITE ELECTRIC CO. INC. | 8 | $95.5M | 🔒 |
| FRACKIEL BUILDERS, INCORPORATED | 8 | $139k | 🔒 |
| TEXA ENGINEERING | 7 | $1.2M | 🔒 |
| A.B.C. PLUMBING, HEATING, COOLING & ELECTRIC, INC. | 7 | $79k | 🔒 |
| ERGEON INC | 7 | $37k | 🔒 |
| CHAVEZ ELECTRIC | 6 | $525k | 🔒 |
Names are public record, so they're on this page — a week late, unsorted, and for every trade at once. A subscription is the other half: the permits that match your trade, in your inbox by 8:30 the morning each one is published, ranked, with the contractor's number wherever it can be found. Chicago issued 679 permits that week. You'd have seen your share of them six days sooner than this page showed them.
Start a free trial →Or go straight to it: Standard $99/mo · Enriched $149/mo — month to month, first month refunded if it doesn't surface a job worth bidding.
This week in other cities: Austin · New York · or today's Chicago permits.