1,306 permits issued in the last few days. Below: the highest-signal ones — the demolitions, new builds, and remodels that mean someone's about to need a dumpster, a pour, a crew, or a bid.
Prefer the whole week? Last week's full New York permit report — every permit, the biggest jobs, and the busiest contractors.
| Address | Permit | What's happening | Who to call |
|---|---|---|---|
| 88-50 SABRE STREET | Solar | FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OC ★★★★★ Fresh roof — prime solar-ready signal |
🔒 subscribers |
| 54 FRANKLIN STREET | Mechanical Systems | INSTALLATION OF NEW ROOFTOP PACKAGE UNITS & ERV UNIT ALONG WITH THE ASSOCIATED PIPING AND DUCTWORK AS PER THE DRAWINGS F ★★★★★ New construction — foundation/flatwork pour coming |
🔒 subscribers |
| 2705 HARWAY AVENUE | Mechanical Systems | SUBSEQUENT FILING OF MECHANICAL WORK AT GROUND FLOOR TO ROOF AS PER PLANS IN CONJUNCTION WITH NB JOB #B01012889. ★★★★★ Fresh roof — prime solar-ready signal |
🔒 subscribers |
| 1415 BURKE AVENUE | Solar | INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. ★★★★★ Fresh roof — prime solar-ready signal |
🔒 subscribers |
| 121-22 6 AVENUE | Solar | FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OC ★★★★★ Fresh roof — prime solar-ready signal |
🔒 subscribers |
| 44 WALL STREET | Mechanical Systems | Mechanical modifications for Interior Demolition as per plans filed herewith. No change to use, egress or occupancy. ★★★★★ Demolition — debris hauling needed within days |
🔒 subscribers |
| 111 GLENWOOD AVENUE | Structural | new wood deck at rear of residence, no change to exist use/egress/occupancy/yards/bulk proposed under this action ★★★★★ New construction — foundation/flatwork pour coming |
🔒 subscribers |
| 1806 ANTHONY AVENUE | Sprinklers | HUB REVIEW HPD PROJECT - IT IS PROPOSED TO FILE FOR SPRINKLER AND STANDPIPE WORK FOR A NEW NINE (9) STORY RESIDENTIAL BU ★★★★★ New construction — foundation/flatwork pour coming |
🔒 subscribers |
| 62-33 DRY HARBOR ROAD | Solar | Installation of solar panels, Roof Top, Grid Tied, railed, (14) Modules, (5.74) kW System Size ★★★★★ Fresh roof — prime solar-ready signal |
🔒 subscribers |
| 875 SIXTH AVENUE | General Construction | INTERIOR RENOVATION WITH DEMOLITION OF EXISTING PARTITION. NO CHANGE IN USE, OCCUPANCY, OR EGRESS ★★★★★ Demolition — debris hauling needed within days |
🔒 subscribers |
| 78-37 GAR 267 STREET | Full Demolition | PROPOSED NON-MECHANICAL FULL DEMOLITION OF EXISTING GARAGE. ★★★★★ Demolition — debris hauling needed within days |
🔒 subscribers |
| 220-11 94 DRIVE | Solar | Installation of solar system on the roof as per plan. No change in use, egress or occupancy ★★★★★ Fresh roof — prime solar-ready signal |
🔒 subscribers |
Every morning by 8:30: all of that day's matching permits for your trade — ranked, with who to call and a ready-to-send opener. This page shows 12 permits; today's full New York report has every one.
Get a free sample week →Ready now? Standard $99/mo · Enriched $149/mo (with who-to-call) — month to month, first month refunded if it doesn't surface a job worth bidding.