Every permit the city issued in Chicago that week, straight from the public record — what got built, what it's worth, and who pulled the paperwork.
| Address | What | Declared | Who pulled it | Phone |
|---|---|---|---|---|
| 307 N MICHIGAN AVE | LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL DATA/VIDEO. SPECIFIC LOCATION: 6TH, 7TH, 13TH FLOORS. | $615.5M | KALISH ELECTRIC CO. | 🔒 |
| 705 W CHICAGO AVE | DDS 2019 CBC: INTERIOR BUILDOUT OF NEW 7-STORY CASINO, PARKING, AND EVENT CENTER BUILDING AND 34-STORY HOTEL T | $580.0M | GURTZ ELECTRIC COMPANY | 🔒 |
| 10000 W OHARE ST | DDS 2019 CBC: FULL BUILDING PERMIT FOR THE CONFINED SPACES PORTIONS OF CONSOLIDATED TUNNEL BETWEEN FUTURE OHAR | $220.0M | GURTZ ELECTRIC CO | 🔒 |
| 100 W RANDOLPH ST | DDS 2019 CBRC: INTERIOR ALTERATIONS TO LEVELS B2, B1, L1, AND L2 FOR BUILDING SHARED AMENITY SPACE. WORK TO IN | $50.1M | CONTINENTAL ELECTRICAL CONSTRU | 🔒 |
| 955 N LARRABEE ST | DDS 2019 CBC: NEW CONSTRUCTION 7 STORY, 79FT, 78 UNIT MULTI-FAMILY RESIDENTIAL BUILDING. 39 PARKING SPACES (5 | $36.9M | MERIT ELECTRIC LLC | 🔒 |
| 3737 W 99TH ST | SPR 2019 SPR: FULL BUILDING PERMIT FOR NEW 1-STORY 2,225 SQFT CENTRAL UTILITY PLANT ADDITION TO EXISTING...BUI | $20.0M | M.J. ELECTRIC, LLC. | 🔒 |
| 3740 N PANAMA AVE | SC 2019 CBRC: CHICAGO PUBLIC SCHOOL - CANTY ELEMENTARY SCOOOL UPGRADES TO EXISTING MECHANICAL EQUIPMENT. REMOV | $7.0M | HORIZON CONTRACTORS, INC. | 🔒 |
| 11601 W TOUHY AVE | LINE VOLTAGE ELECTRICAL WORK. ALTER EXISTING SYSTEM II EMERGENCY LIGHTING. RECEPTACLE OUTLETS: 0 . LIGHTING O | $6.7M | COURTESY ELECTRIC, INC. | 🔒 |
| 1331 S WELLS ST | DDS 2019 CBC: PILES ONLY PERMIT (VERTICAL PENETRATION ONLY) FOR THE NEW CONSTRUCTION OF A 4 STORY STADIUM (OCC | $5.0M | PEPPER CONSTRUCTION COMPANY | 🔒 |
| 360 N GREEN ST | SELFCERT 2019 CBRC: INTERIOR ALTERATIONS TO EXISTING 8TH FLOOR OFFICE SPACE. NO CHANGE TO EXISTING USE. (OCCUP | $3.7M | KELSO-BURNETT CO. | 🔒 |
| Address | What | Declared | Who pulled it | Phone |
|---|---|---|---|---|
| 5118 W BERENICE AVE | NEW DETACHED WOOD FRAME GARAGE. DIMENSIONS AND SETBACKS PER APPLICATION. BUILDING OUTSIDE DIMENSIONS: 22'-0' ' Fresh roof — prime solar-ready signal |
$26k | BEYOND CUSTOM CO DBA STANLEY GARAGE BUILDERS | 🔒 |
| 4425 N SACRAMENTO AVE | NEW DETACHED WOOD FRAME GARAGE. DIMENSIONS AND SETBACKS PER APPLICATION. BUILDING OUTSIDE DIMENSIONS: 22'-0' ' Fresh roof — prime solar-ready signal |
$41k | BEYOND CUSTOM CO DBA STANLEY GARAGE BUILDERS | 🔒 |
| 5321 S NARRAGANSETT AVE | NEW DETACHED WOOD FRAME GARAGE. DIMENSIONS AND SETBACKS PER APPLICATION. BUILDING OUTSIDE DIMENSIONS: 20'-0' ' Fresh roof — prime solar-ready signal |
$30k | BEYOND CUSTOM CO DBA STANLEY GARAGE BUILDERS | 🔒 |
| 4305 N HAMLIN AVE | NEW DETACHED WOOD FRAME GARAGE. DIMENSIONS AND SETBACKS PER APPLICATION. BUILDING OUTSIDE DIMENSIONS: 24'-0' ' Fresh roof — prime solar-ready signal |
$29k | BEYOND CUSTOM CO DBA STANLEY GARAGE BUILDERS | 🔒 |
| 7658 S COTTAGE GROVE AVE | SPR 2019 CBRC: INSTALLATION OF A 198 KW DC/150 KW AC ROOF MOUNTED PHOTOVOLTAIC SYSTEM CONSISTING OF 440 SOLAR New construction — foundation/flatwork pour coming |
$300k | PURE POWER ELECTRICAL,CORP. | 🔒 |
| 655 N MONTICELLO AVE | SPR 2019 CBC: NEW 2-STORY+ BASEMENT FRAME BUILDING (3 DWELLING UNITS)NEW STEEL FRONT STAIRS. NEW STEEL REAR 2- New construction — foundation/flatwork pour coming |
$290k | BLUE LINE ELECTRICAL CONTRACTO | 🔒 |
| 651 N MONTICELLO AVE | SPR 2019 CBC: NEW 2-STORY+ BASEMENT FRAME BUILDING (3 DWELLING UNITS)NEW STEEL FRONT STAIRS. NEW STEEL REAR 2- New construction — foundation/flatwork pour coming |
$290k | BLUE LINE ELECTRICAL CONTRACTO | 🔒 |
| 657 N MONTICELLO AVE | SPR 2019 CBC: NEW 2-STORY+ BASEMENT FRAME BUILDING (3 DWELLING UNITS)NEW STEEL FRONT STAIRS. NEW STEEL REAR 2- New construction — foundation/flatwork pour coming |
$290k | BLUE LINE ELECTRICAL CONTRACTO | 🔒 |
| Contractor | Permits | Declared value | Phone |
|---|---|---|---|
| SUNRUN INSTALLATION SERVICES INC | 11 | $54k | 🔒 |
| FREEMAN ELECTRICAL, INC. | 9 | $9k | 🔒 |
| SUNRUN INSTALLATION SERVICES | 7 | $145k | 🔒 |
| PEERLESS ENTERPRISES LLC | 7 | $49k | 🔒 |
| BLUE LINE ELECTRICAL CONTRACTO | 6 | $1.3M | 🔒 |
| CAMPANILE CONSTRUCTION & DESIG | 6 | $193k | 🔒 |
| FLASHTRIC INC | 6 | $7k | 🔒 |
| BETTER BUILT LUMBER & SUPPLY, INC. | 5 | $166k | 🔒 |
| SUNRISE SOLAR LLC | 5 | $75k | 🔒 |
| ALVAREZ ELECTRICAL TECH | 5 | $28k | 🔒 |
Names are public record, so they're on this page — a week late, unsorted, and for every trade at once. A subscription is the other half: the permits that match your trade, in your inbox by 8:30 the morning each one is published, ranked, with the contractor's number wherever it can be found. Chicago issued 563 permits that week. You'd have seen your share of them six days sooner than this page showed them.
Start a free trial →Or go straight to it: Standard $99/mo · Enriched $149/mo — month to month, first month refunded if it doesn't surface a job worth bidding.
This week in other cities: Austin · New York · or today's Chicago permits.